Load Shedding Schedule Sahiwal and Pakpattan (April 2026)

If you live or work in the Sahiwal, Arifwala, or Pakpattan regions, you might experience planned power outages this April. The Multan Electric Power Company (MEPCO) has approved several shutdowns to facilitate essential infrastructure upgrades, including road widening projects and the rehabilitation of high-tension (HT) lines.

This guide breaks down exactly when and where the power will be out, why it’s happening, and what safety measures are in place. To check your Mepco bill online, visit Mepco online bill


Why is the Power Being Cut?

These are not random load-shedding events. MEPCO is conducting specific technical works to improve the local grid and support regional development. Key projects include:

  • Road Rehabilitation: Shifting electric poles and lines for the widening of the Sahiwal-Arifwala-B.Nagar Road and the Kacha Pacca Noor Shah Road.
  • Infrastructure Upgrades: Erection of 45-foot HT Spun Poles and new stringing work for housing schemes like Royal Orchard.
  • Connectivity: Linking new 132-KV Grid Stations (like Pakpattan-II) to existing feeders to improve voltage stability.

Quick Summary of Load Shedding Schedule Sahiwal

  • Primary Timing: Most shutdowns are scheduled from 08:00 to 13:00 (8:00 AM to 1:00 PM).
  • Affected Regions: Sahiwal, Arifwala, Pakpattan, and surrounding rural divisions.
  • Safety Supervisors: Muhammad Rafiq, Rao Nouman Ali, Shahid Mehmood, and Rana Iftikhar have been appointed to monitor these sites.

Power Shutdown Schedule Sahiwal Division

The following schedules cover the Sahiwal-I and Sahiwal-II divisions, including the city and rural extensions.

Sahiwal City & Rural Feeders (Road Widening & Maintenance)

These shutdowns facilitate the shifting of electric poles for the Kacha Pacca Noor Shah Road and the Sahiwal-Arifwala Road projects.

Date (April 2026)11-KV Feeder NameAssociated Grid / Area
04, 08, 09, 11, 15, 16, 18, 22, 23, 25, 27-30City / Ansar132-KV Sahiwal Old / New
04, 06, 09, 11, 13, 14Al-Aman Garden / Punjab Govt Servant Housing / Multan Road132-KV Sahiwal Old
04, 06, 09, 11, 13, 16, 18Ratti Tibbi / Korray Shah / Noor ShahSahiwal New Grid
06, 09, 11DHQ Teaching Hospital / Shadman / Chak 85132-KV Sahiwal New
09, 11, 13, 14Pakpattan Road / Allama Iqbal500-KV Yousaf Wala
13, 20, 21, 22, 27-3019-More / Budh Dhakoo / Balley Wala132-KV Sahiwal Old
20, 23, 25, 27-3065-Yarey Wala / Medhali Sharif132-KV Sahiwal-New

Power Shutdown Schedule Arifwala Division

The shutdowns in Arifwala are largely due to the rehabilitation of the Sahiwal-Arifwala-B.Nagar Road (RD-1319 to RD-1376).

Date (April 2026)11-KV Feeder NameFeeder Code
06.04.26Tirikhni000512
06.04.26 to 09.04.26Kamir City111302
07.04.26Nawaban Wala000517
08.04.26Qalandar Shah000523
09.04.26New Factory000505
09.04.2650/SP (Kameer Sub-Division)111309
11.04.26City A/Wala000511
13.04.26Old Factory000502

Power Shutdown Schedule Pakpattan Division

Work in Pakpattan is centered around the connectivity of the new 132-KV Grid Station Pakpattan-II.

Date (April 2026)11-KV Feeder NameAssociated Grid
04.04.26 to 16.04.26Ghulam Haider / Sanday Khan132-KV Pakpattan
06.04.26Karmanwala / Al-Noor132-KV Pakpattan-II
08.04.26Hallah / PPN Road132-KV Kameer
18.04.26 to 30.04.26Rehmat Shaheed / Asghar Hussain / Nazim Shah132-KV Pakpattan-II
21.04.26 to 23.04.26Hari Pur / Jaffar ShahHari Pur Grid
23.04.26 to 30.04.26Baba Fareed500-KV Yousaf Wala
25.04.26 to 30.04.26Noor Pur / Waris Shah / Sher Shah / Noor Jang132-KV Noor Pur

Safety Protocols and Public Awareness

MEPCO has outlined strict requirements to minimize the impact on the general public:

  • Mosque Announcements: Loudspeakers in local mosques must be used to inform the public before a shutdown begins.
  • Newspaper & Media: Advertisements must be placed in important newspapers and announced via electronic media.
  • SMS Services: The IT Cell will send SMS alerts directly to consumer mobile numbers in the affected areas.
  • Safety Monitoring: Safety Inspectors will monitor every site to ensure the implementation of “true letter and spirit” safety measures, specifically ensuring low-tension (LT) lines do not cross roads during work.

Actionable Tips for Residents

  1. Water Management: Since most outages happen in the morning (08:00 AM to 01:00 PM), ensure your water tanks are filled before the shutdown starts.
  2. App Updates: Check the Roshan Pakistan App for real-time updates and load management schedules specific to your feeder code.
  3. Appliance Safety: Unplug sensitive electronic equipment (like computers or air conditioners) before the scheduled restoration time to prevent damage from potential voltage surges.

For further information or to report a delay in restoration, you can contact the MEPCO Multan headquarters at 061-6305545.

Similar Posts

  • Load Shedding Schedule Vehari

    MEPCO Load Shedding Schedule Vehari for April 2026: Dates and Timings MEPCO has announced a series of scheduled power shutdowns for the Vehari Circle, specifically affecting areas in Burewala. These outages are necessary for the erection of poles and wire stringing work related to the road widening project at High School No. 2 Main Road….

  • Load Shedding Schedule Khanewal

    MEPCO Load Shedding Schedule Khanewal Circle for April 2026: Dates and Timings Planned power outages are a common part of infrastructure development, and staying informed helps you manage your day without frustration. MEPCO (Multan Electric Power Company) has announced a significant maintenance and construction schedule for the Khanewal Circle throughout April 2026. This guide provides…

  • Power shutdown Bahawalpur

    Scheduled Power Shutdown Bahawalpur Circle | 09 February A scheduled electricity shutdown has been announced for several areas in the Bahawalpur Circle dated 09 February 2026 from 8:00 am to 1:00 pm to allow routine maintenance and system improvement work. The power interruption is part of planned technical activities aimed at ensuring a safer and…